Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Glasgow Museum of Transport

See More

Recent projects

                                                                

Shahama Saadiyat Freeway, Abu-Dhabi:

See More

Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Dubai International Airport:

See More

Contact Us

Registered Office

Tel. +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net


Corporate Office

Tel: +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net

Gibraltar Airport PNR facility Building:

The PNR facility is a new structure situated at the corner of Winston Churchill Avenue and Devils Tower Road near to existing Gibraltar Airport .The primary function of the building is to serve as a car park for people driving into Gibraltar, giving more direct and easier access to the city centre by shuttle bus or by foot.
The structure is split into two equal sized phases. The main body of the structure is approximately 150m long, 31m wide and 18m tall. There are five RC storeys plus a steel canopy at roof level. The south elevation of the building features a curved walkway which is approximately 6.5m wide at it’s widest point. The walkway is supported from a line of columns on the façade from level 1 upwards. Below level 1 is a walkway which is cantilevered, typically 1m.

Kashec’s Contribution:

Kashec was associated with the project in providing Rebar detailing services for Spine beams, square/rectangular and circular columns, floor slabs from Level G01 to G05, ramps,

RC up stands etc. The project had approximately 175 (A1 sized) RC drawings which were completed within 5 months.

The Lansdowne Road Stadium:

The proposed stadium consists of continuous curvilinear shaped stand enclosing all four sides of the ground. The South, East, and West stands all have four tiers of seating for spectators.  On the North side there is only one tier as the stadium comes down dramatically in height.  The new stadium contains all of the features which would be expected in a modern stadium

The Lansdowne Road Stadium has been designed to be a state-of-the-art modern stadium, which, on completion, will have an all seated capacity of 50,000.

Kashec’s Contribution:

Kashec was associated with the project in providing Rebar detailing services. The elements involved in detailing were Pile caps, ground beams, basement slabs, ground floor slab with tunnels and service ducts, floor slabs from level G01 to G06, core base, core walls, exterior retaining walls, blade columns, staircase and landings.

The project consisted of approximately 600 A1 sized drawings which were completed within a demanding time scale.

Grosvenor Waterside:

Grosvenor Waterside boasts a group of grand buildings inspired by a group of leading architects, grouped around the historic dock just north of Chelsea Bridge. The magnificent landscaped grounds surrounding the picturesque dock location together with the underground parking, 24 hour concierge and leisure facilities makes Grosvenor Waterside an enviable location.

Kashec’s Contribution:

Kashec’s role was to provide rebar detailing services for the project. It involved detailing of Pier Pile Caps or Pier rafts, columns, slabs, walls, Cores, Beams etc.

Approximately 100 nos. A1 sized Rebar shop drawings were completed in 4 months.