Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Glasgow Museum of Transport

See More

Recent projects

                                                                

Shahama Saadiyat Freeway, Abu-Dhabi:

See More

Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Dubai International Airport:

See More

Contact Us

Registered Office

Tel. +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net


Corporate Office

Tel: +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net

Flyover at Mondha Square on Pune – Jalna Road

Client: MSRDC Ltd. Aurangabad, Maharashtra.

Project Cost: Rs. 25 crores

Project Period: 18 months

Project Details:


Spans

7 Nos. (25 m. each) Pre Cast & Pre Stressed 6 (Six) Girder System & Cast in Situ Deck Slab structure.


Total length of Viaduct

175.00 m (7 Span of 25 m C/C ) excluding R.E. Wall Ramps in approaches.

Width 16 m outside Crash Barrier


Total Length including RE Wall

a) Bridge Portion = 175.00 m

b) Solid Approach 100 + 225 = 325.00 m

Total length of Slip road

Slip Roads as per site Requirement. (600.00 m) Both sides

Total Length (a + b)= 175 + 325 = 500.00 m


Open Type Foundation


Sub-Structure

RCC Footing in M-35, all Piers, all Abutments, Pier cap, and Pedestal in    M-50.


Super-Structure

i) M-50 Pre-cast PSC 6 Girder system with cast in situ Diaphragms and Deck Slab with 2.0 m Cantilever on either side.

ii) Bearings - POT – PTFE.

iii) Expansion joint - Strip Seal type


Scope of Services

  • Surveys & Investigations -  traffic, topographic, soil and hydrological surveys
  • Structural design.
  • Detailed Project Report, Estimation, Tender documentations and specifications.
  • Total Project management consultancy services in pre & post tender activities.



Railway Over Bridge on Mundhwa over Pune – Solapur Railway line

Client: Pune Municipal Corporation, Pune, Maharashtra.

Project Cost: Rs. 24 crores

Project Period: 2.5 years


Project Details:


This is a railway over bridge. Total length of the bridge is 640 m. It consists of 445.50m solid approach and 194.50 viaduct portion.

The Railway  span length is 44.5m. It comprises a structural steel frame with RC deck slab, each side has a 3 span continuous precast girder with a RC deck slab.

Scope of Services


  • Surveys & Investigations -  traffic, topographic, soil and hydrological surveys
  • Structural design.
  • Detailed Project Report, Estimation, Tender documentations and specifications.
  • Total Project management consultancy services in pre & post tender activities.

Flyover at Lullanagar Chowk, Pune.

Client: Pune Municipal Corporation, Pune, Maharashtra.

Project Cost: Rs. 15 crores

Project Period: 2.5 years


Project Details:


The project consists of flyover having a length of 450 m long x 15 m wide.


Scope of Services


  • Surveys & Investigations -  traffic, topographic, soil and hydrological surveys
  • Structural design.
  • Detailed Project Report, Estimation, Tender documentations and specifications.
  • Total Project management consultancy services in pre & post tender activities.