Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Glasgow Museum of Transport

See More

Recent projects

                                                                

Shahama Saadiyat Freeway, Abu-Dhabi:

See More

Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Dubai International Airport:

See More

Contact Us

Registered Office

Tel. +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net


Corporate Office

Tel: +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net

RWUST Utility Tunnel & Electrical Tunnel, Saudi Arabia:

This Tunnel is being built to carry the service utilities underground for the dream project of Kingdom of Saudi Arabia i.e. Princess Noura Bint Abdulrahman University for Women.

The tunnel is 5 Kms in length having variations in width, height & slopes at varying intervals. It has mechanical rooms, administration tunnels, finger tunnels, ventilation shafts etc.

Kashec’s Contribution:

Kashec’s role in this Project was to provide the Reinforcement shop drawings for the Utility service tunnel as per ACI standards. RC detailing Involved Base Slab, Walls (Internal & External), Retaining Walls, Entrance Ramps, Roof Slabs, various shaped Ventilation Shafts, Mechanical Rooms and Finger tunnels etc. Approximately 425 nos. A0 sized Rebar shop drawings were completed in 12 months.

EPC for Providing RO-RO Ferry Terminal at Gogha & Dahej (Gujarat)

  1. First RO-RO (Roll on – Roll off) Project being built in India.
  2. Kashec worked with Essar Projects to produce bid winning proposal.
  3. Challenging Marine Environment, current in excess of 4.0 Knots, 11 m diurnal Tides – 2nd highest tidal range in world, 4.0m wave height at exposed berth location.
  4. Designed for RO-RO & Ro Pax vessels upto 16000 Ton displacement/ 27500 Gross tonnage.
  5. 1100 m long approach at Gogha Consisting of 4 lane/ 500m  long bund + 2 lane 600 m long approach jetty.
  6. 200 m long approach at Dahej.
  7. Each site to have 96m long / 750 tons single span Linkspan + 30m x 50m pontoon weighing 800 tons.
  8. Torsionally soft linkspan designed for “U Frame” action to accommodate pontoon pitch/ Roll due to 4.0m high extreme wave.
  9. Kashec provided fully integrated design services at pre + post tender stage for all works viz. Civil + structural, architectural planning, lighting, electrical, fire fighting, HVAC, drainage, fuel supply etc.

Providing Infrastructure to Facilitate Ro-Ro PAX Services and Construction of Breakwater at Mandwa, Tal - Alibag, Dist- Raigad.          

Client : Maharashtra Maritime Board   

Project Cost : Rs 130.08 Crore

Full pre & post tender design & Project Management Consultancy services.Construction of one approach jetty of 214 m long and 10 m wide, Piled turning platform of 30 m long and 30 m wide, Structural steel pontoon 22 m long and 20 m wide, 6 nos. of Mooring dolphins of 8 m long and 7 m wide and 12 nos. cast iron bollards and 6 nos. of parallel motion fenders, Reclamation bund of 159 m long and 100 m wide, Terminal building of 761.56 sqm including waiting area, food counter kitchen, ticket counter,  other utilities such as Electrical Panel Room, STP, UGT, Electrical and Fire fighting provisions.