Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Glasgow Museum of Transport

See More

Recent projects

                                                                

Shahama Saadiyat Freeway, Abu-Dhabi:

See More

Recent projects

                                                                

Bund Garden Bridge

See More

Recent projects

                                                                

Dubai International Airport:

See More

Contact Us

Registered Office

Tel. +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net


Corporate Office

Tel: +91 (0) 20 66472235
Fax. +91 (0) 20 66472232
Email: hr@kashecindia.net

Feasibility Study & Detailed Project Report for NH66 (17) near Pen connecting to Khopoli terminating at NH48 (4)

Client: Public Works Department, National Highway Circle, Pen-Raigad, Maharashtra

Project Cost: Rs. 324 crores

Project Period: 6 months

Project Details :

  1. Total Length of Road: 33.328 (Rigid Pavement)
  2. 2 lane with PQC/ Rigid pavement for the length of 30.628 Km.
  3. 4 lane with PQC/ Rigid pavement for the length of 2.70 Km.
  4. Major Bridges 3 Nos. (2 Nos. x 100m + 1 Nos. 72m)
  5. Minor Bridges 14 nos. (Total length = 190 m)
  6. VUP's - 2 nos.
  7. Flexible pavement - 3.90 Km (Connectors)
  8. Micro surfacing on Pavement Quality Concrete (PQC) pavement is also proposed as new technology.


Scope of Services


  • DPR Preparation
  • Feasibility study
  • Land Acquisition Survey & Records preparation
  • Topographic survey
  • Geotechnical survey
  • Traffic survey

Feasibility study for Improvement's to Kolhapur-Sawantwadi Road

Client: M.S.R.D.C. Ltd. Pune, Maharashtra

Project Cost: Rs. 1200 crores

Project Period: 1 year

Project Details:         


There are 5 different routes from Kolhapur to Sawantwadi.

The total length of these 5 routes is 537 Km. (Flexible pavement).

The project consisted of the selection of most economic and practical route from the 5 alternative routes from Kolhapur to Sawantwadi.


Scope of Services


  • Feasibility study Report Preparation
  • Detailed Block Estimates
  • Detailed Reconnaissance survey
  • Topographic survey
  • Geotechnical survey
  • Traffic survey

Link road between Nagar Road and Paithan Road at Aurangabad

Client: MSRDC Ltd., Aurangabad, Maharashtra

Project Cost: Rs. 40 crores

Project Period: 18 months

Project Details:                     

4 lane Link Road having 7.5 X 2 carriageway, 1.5 m shoulders both sides, Median of 600 mm, one major bridge (10m span 7 nos) four lane deck with parapet abutments, piers returns approach slab etc.

Total Length of the Project Highway (in Km): 4.126km. road

Carriageway Width (in M): 7.5 X 2

Length of Bridge (in m) : 70m

Span configuration of bridge (in M): 10m span 7 nos


Scope of Services:

  • Preparation of Detail Project Report
  • Topographic Survey, Traffic Survey and Geotechnical Investigations
  • Geometrical & Structural Design
  • Tender drawings, Estimate & Tender preparation
  • Evaluation of Bids
  • Assisting MSRDC in fixing Agency
  • Project Management Consultancy during Execution Phase